The measurement delay function allows adding an additional time delay at each measurement point between the moment when the source output frequency becomes stable and the start of the measurement. This capability can be useful for measurements of electrically-long devices and narrowband circuits with a transient period longer than the measurement in one point.
The channel to which the function is applied must be preselected as active (See Selection of Active Trace/Channel ).
To set the measurement delay time, use the following softkeys: Stimulus > Meas Delay |
|
|