Turn on the Analyzer and warm it up for the period of time stated in the datasheet.
Ready state features |
The bottom line of the screen displays the instrument status bar. It should read Ready. |
Connect the DUT to the test port of the Analyzer. Use the appropriate adapters for connection of the DUT input to the Analyzer test port if it is impossible to connect the DUT input to the test port directly.