Please enable JavaScript to view this site.

 Network Analyzers using S4VNA software

The Module maintenance includes the following activities:

Inspection.

Functional test.

The inspection should be done every time before and after the Module is used.

The inspection comprises:

Checking components against the delivery kit list.

Cleaning dust and dirt from external surfaces of the Module. To clean the Module’s external surfaces, use dry or slightly wet cloth. Do not clean the Module inside.

Cleaning connectors as described in Cleaning Connectors.

Functional test should be carries out once per 100 connections.

The functional test includes:

Inspection.

Module connectors gauging as described in Gauging Connectors.

Confidence check.

 

Rev.:  22.4