Please enable JavaScript to view this site.

 Network Analyzers using S4VNA software

Getting Started

Analyzer Preparation for Reflection Measurement

Scroll Contact Us Home Prev Top Next More

Turn on the Analyzer and warm it up for the period of time stated in its specifications (40 minutes typically).

Ready status indication

The bottom line of the screen displays the instrument status bar. It should read Ready.

Ready 

Sweep progress indication

The channel status bar is located above this bar. The sweep indicator in the left-hand part of this bar should display sweep progress

Sweep progress

Connect the DUT to Port 1 of the Analyzer. The DUT can be connected directly to the port if the type of connectors is the same and the gender is opposite. Otherwise use the appropriate cables and adapters for connection of the DUT input to the Analyzer test port.  Use a calibrated torque wrench to tighten the connectors.

 

Rev.:  22.4