Automatic Calibration Module

This section includes the example of the Module work session. Perform the following activities to calibrate all types of VNAs:

Locate the Module at the work site and warm it up for at least 15 minutes.

Set up the VNA parameters, at which calibration and DUT parameters measurement will be performed.

Assemble a test setup.

Connect the Module (typical connection diagrams are shown in Connection Diagrams).

Perform the required calibration.

Disconnect the Module and connect the DUT in its place.

 